Assess & Map
Audit your current cloud and on-prem OT/IT environment, identifying gaps in uptime, DR, compliance, security, and IEC 62443/ISO 27001 controls.
Move your OT/IT workloads to a secure, compliant cloud environment built for 99.9% uptime, disaster recovery, and audit-ready manufacturing compliance.
Manufacturers today operate at the intersection of heavy operations, connected machines, and legacy systems. Yet many cloud migrations are built for IT-only environments, leaving OT, plant-floor systems, compliance, and uptime exposed.
Most manufacturing cloud environments were architected for IT apps, not production lines, causing segmentation, DR, and audit controls to break during migrations.
Audit your current cloud and on-prem OT/IT environment, identifying gaps in uptime, DR, compliance, security, and IEC 62443/ISO 27001 controls.
Create a migration roadmap that secures OT/IT, establishes DR readiness, and designs OT zones/conduits aligned with audit-ready control requirements.
Shift manufacturing workloads to AWS, Azure, or hybrid environments with near-zero downtime, validating DR and failover paths before cutover.
Run ongoing cloud operations with OT/IT security, DR readiness, compliance checks, uptime monitoring, and continuous SOC-aligned visibility.
No. We design migration paths that maintain manufacturing uptime, using staged transitions and parallel environments to ensure zero or minimal production disruption.
We apply OT-first security, network segmentation, strict access controls, continuous monitoring, and hardened configurations to protect connected plant systems throughout migration.
Manufacturers typically see optimized resource usage, reduced infrastructure overhead, improved system visibility, and 20–30% cost savings depending on workload complexity.
We map requirements, secure data flows, implement audit-ready controls, maintain integrity, and validate configurations to keep manufacturing compliance intact during migration.
Both works effectively; selection depends on workload type, OT integration needs, existing tools, compliance requirements, and long-term operational goals.
Assessments take one to two weeks; migration timelines vary based on workload size, OT dependencies, integration complexity, and required downtime safeguards.